Tower Bridge Fire Supression Works
Arguably one of the country’s most important landmarks, Tower Bridge was built in 1886-94 by the City of London Corporation acting as trustee of the Bridge House Estates.
Situated on a unique site straddling the boundary between the London Boroughs of Tower Hamlets and Southwark, the bridge is Grade I-listed and open to shipping 24 hours a day, 365 days a year, and is a world-famous structure and major visitor attraction.
As part of a multidisciplinary team, we are providing conservation engineering services during the Pre-Construction Services Agreement (PCSA) stage to replace and enhance the outdated and inadequate site-wide firefighting sprinkler system protecting the entire bridge, encompassing the north and south towers, the north and south abutments, the high-level walkways, the engine room and the shop. The project also involves replacing the gas suppression system and will renew the boosted mains and domestic water systems serving the north and south towers. The new system components will be seamlessly incorporated within the wider Building Management System which controls and monitors all of Tower Bridge’s mechanical and electrical equipment. Completion of these important enhancement works will ensure this iconic heritage asset is suitably preserved for generations to come.
Working closely with conservation architects Purcell, mechanical & electrical engineers Max Fordham and principal contractor Thomas Sinden, our role involves sensitively forming new openings through historic fabric to accommodate the new services across the site, assessing the structural capability of the engine room to support the significant weight of the new sprinkler system reservoir, and advising on challenging temporary works and logistical aspects to facilitate the installation of the new and improved elements. Crucial to the wider team’s progress has been our collective engagement with key stakeholders including The City of London, The London Borough of Tower Hamlets, The London Borough of Southwark, The Port of London Authority and Historic England, amongst others.
Our work for this project has encompassed the entirety of Tower Bridge; consequently, we have developed an understanding of the whole structure in some detail (as opposed to focused projects such as those previously undertaken in recent years), including new information acquired from intrusive investigations in the southern approach, bridge decks and reservoir.
Client:
City of London Corporation
Architect:
Purcell
Project Value:
£3.5million