Cabbage Creek Footbridge, Stiffkey
The National Trust progressed with a replacement footbridge on the Stiffkey Saltmarshes, North Norfolk.
The marshes are an Area of Outstanding Natural Beauty and are also protected by many environmental designations (including SSSI and RAMSAR). The delicate ecology of the site, including overwintering birds and otters, restricted any construction works to just a few months of the year. Consents from the local Planning Authority, Natural England, and the Marine Management Organisation all needed to be carefully negotiated and agreed for any works that were undertaken.
The bridge was designed as a single span of 20 m, 1.5 m wide. This will improve accessibility to the saltmarsh along a newly designated public right of way. Safe access for emergency services aims to reduce reliance on RNLI watercraft when high tides can leave visitors to the marsh stranded.
Construction materials have been carefully considered to achieve a design life of 30 years in a challenging and aggressive environment. Recycled Plastic has been chosen for the barriers and deck structure to increase durability, reducing the need for maintenance during its life and minimising embodied carbon. The bridge has been designed to accommodate anticipated erosion of the banks without compromising its stability.
The new bridge was successfully delivered within the required time period in November 2024.
Client:
National Trust
Architect:
N/A
Project Value:
£250,000