This development, delivered by CamProp with MCW Architects and Conisbee, replaced an existing building and enhanced the street frontage and public realm around Newnham Mill.
With ground floor commercial spaces and upper floor apartments offering great views, the project is energy-efficient, well-designed, and positively impacts the character and distinctiveness of the local area.
In consideration of the site’s sensitivity and public interest in its redevelopment, initiated consultation sessions were held with local community groups. The sessions included representatives from the South Newnham Residents Forum and Newnham Croft Residents Association to discuss design work.
The site is within flood zone 2 & 3, necessitating careful consideration from concept design to detailed construction. Conisbee provided the preplanning service including the flood risk assessment, compensation strategy, evacuation strategy and sequential flood testing. Close collaboration with the design team was required to provide understanding of flood-resistant measures that were integral to the design.
Placing all residential units on the first floor and out of the flood risk zone was critical. Additional measures for ground floor areas included in situ concrete up to the first floor and high-level routing of power and data feeds. Temporary flood barriers can be inserted into external door frames.
Photography @Philip Vile
hello index Minster House, Hatfield
Conisbee were appointed by Welwyn Hatfield Borough Council through their framework agreement to design 91 high-quality apartments to support independent living for residents who are 60 and over.
The new apartments have replaced the previous council-owned older persons housing scheme at Minster Close, which was identified as no longer being fit for purpose. The apartments are social rented accommodation managed by the council.
The one and two-bedroom apartments were designed to standards that enhance the health and well-being of their residents, maximising living space and making the most of the natural light. The high-quality apartments include standout features such as individual balconies, contemporary bathrooms, and adapted kitchens. The development also includes a large outdoor space, library, hairdresser, community lounge, and an arts and crafts room.
The contemporary apartment complex was designed and based around the ‘HAPPI’ principles, incorporating space and flexibility, shared facilities and hubs, planted trees and the natural environment. The development designs have been planned around the changing needs of tenants.
Photography @Rock Townsend Architects
hello index Cabbage Creek Footbridge, Stiffkey hello index Spencer Park, London hello index Sawston Unity Campus, Phase 2Sawston Unity Campus Phase 2 marks the continuation of development at Sawston Trade Park, introducing three new office and life sciences buildings alongside an extension to the existing multi-storey car park.
Our involvement in this project spanned RIBA Stages 2 to 6, focusing on the construction of facilities tailored for life sciences and healthcare purposes. The total construction value is estimated at £15 million, with the new buildings covering a gross internal area (GIA) of 5630 square meters and the multi-storey car park adding 4500 square meters.
Key facilities include offices, laboratories, healthcare facilities, and ample car parking space. The structural concept used was reinforced concrete frames with precast vertical elements.
Design solutions were implemented to address site constraints, including ground contamination. Sustainability was a priority throughout the project, with carbon calculations and options comparisons conducted from RIBA Stage 2 onwards. The SCORS Carbon Calculator indicates a Grade C rating, with emissions estimated at 232 kg/m2. A Design and Build procurement route was followed.
hello index Church Inn, Manchester hello index Earth Music VenueConisbee were approached by the client to install an independent structure at the Earth Music Venue.
The new timber stage construction infills the void at circle level at the existing Evolutionary Arts Hackney (EartH) and allows the lower and upper levels as two separate spaces simultaneously.
The works included structural remodelling and refurbishment to introduce a new stage deck and improving accessibility throughout the venue, with structural solutions provided that functionally fit the brief while also being sympathetic to the history and aesthetic of the existing structure.
Photography ©EartH
hello index Brighton School for Girls hello index Trafalgar StudiosTrafalgar Studios, previously The Whitehall Theatre, was opened in 1930 and became Grade II-listed in 1997.
The original auditorium consisted of a shallow raked stall and a steeply raked circle, with the balcony front close to the stage.
In 2004 the theatre was altered to create two performance studios. Studio 1, with approximately 380 seats was formed by extending the existing circle to a new raised open stage, which extended forward of the proscenium, and Studio 2, with 100 seats, was formed in the rear stalls under the circle.
This scheme for Trafalgar Entertainment involved the return of the theatre to its original configuration as a single auditorium space, and the general refurbishment of front of house and backstage areas.
Works to the auditorium include removal of the existing lightweight staging and partitions to Studio 1 & 2, reinstatement to the circle, raised floors to the stage and stalls, and renewal of carpets, decorations, and seats. The foyer was upgraded, and public WCs at the front of house were also modernised. There were minor renovations to backstage areas including adjustment of stage level for improved sight lines. The project also involved the minor repair of stonework at the building’s main façade, and there were new roof coverings and a new plant deck.
Our team assisted with the remodelling works to the entrance foyer including removal of the existing load-bearing shaft walls and removal of the load-bearing wall adjacent to the cloak room and the re-supporting of the structure; removal of disused lift shafts from ground to roof and infilling of the floor; removal of walls to form the new female toilets, provision of a new structure for a new ventilation system involving support of the new ventilation plant at roof level, the removal of existing ductwork, and new ductwork routes and openings in the existing structure.
Conisbee also provided services for the reinstatement of the circle front including design of the new supporting structure and lighting bars. New strong points were installed within the auditorium in the ceiling void spaces in front of the proscenium and around the ceiling dome to support the lighting doughnut. Threaded sockets were installed around the proscenium and boxes to accept fixings for lighting/ladders bars.
The refurbishment works were successfully completed on programme with the theatre reopening in April 2021.
Photography ©Tom Lee