This development, delivered by CamProp with MCW Architects and Conisbee, replaced an existing building and enhanced the street frontage and public realm around Newnham Mill.
With ground floor commercial spaces and upper floor apartments offering great views, the project is energy-efficient, well-designed, and positively impacts the character and distinctiveness of the local area.
In consideration of the site’s sensitivity and public interest in its redevelopment, initiated consultation sessions were held with local community groups. The sessions included representatives from the South Newnham Residents Forum and Newnham Croft Residents Association to discuss design work.
The site is within flood zone 2 & 3, necessitating careful consideration from concept design to detailed construction. Conisbee provided the preplanning service including the flood risk assessment, compensation strategy, evacuation strategy and sequential flood testing. Close collaboration with the design team was required to provide understanding of flood-resistant measures that were integral to the design.
Placing all residential units on the first floor and out of the flood risk zone was critical. Additional measures for ground floor areas included in situ concrete up to the first floor and high-level routing of power and data feeds. Temporary flood barriers can be inserted into external door frames.
Photography @Philip Vile
hello index Minster House, Hatfield
Conisbee were appointed by Welwyn Hatfield Borough Council through their framework agreement to design 91 high-quality apartments to support independent living for residents who are 60 and over.
The new apartments have replaced the previous council-owned older persons housing scheme at Minster Close, which was identified as no longer being fit for purpose. The apartments are social rented accommodation managed by the council.
The one and two-bedroom apartments were designed to standards that enhance the health and well-being of their residents, maximising living space and making the most of the natural light. The high-quality apartments include standout features such as individual balconies, contemporary bathrooms, and adapted kitchens. The development also includes a large outdoor space, library, hairdresser, community lounge, and an arts and crafts room.
The contemporary apartment complex was designed and based around the ‘HAPPI’ principles, incorporating space and flexibility, shared facilities and hubs, planted trees and the natural environment. The development designs have been planned around the changing needs of tenants.
Photography @Rock Townsend Architects
hello index Church Inn, Manchester hello index Dovehouse Court, Girton Town Charity
hello index Joseph Lancaster House, London hello index Royal Borough of Greenwich Social Housing hello index Thrayle House, Stockwell hello index Danesgate, Stevenage
Conisbee were appointed by Lovell Partnership to assist with the development, which comprises a mix of 526 residential units for shared ownership and social rent, with part of the ground floor allocated to commercial use and private parking.
The site is divided into six independent blocks, with the landmark apartment tower—a 21-storey reinforced concrete frame—situated on the north-west corner. Courtyards between the blocks provide communal outdoor areas for residents and have also been designed to incorporate the site’s SuDS strategy.
The development is constrained by a high-pressure gas main bisecting the site which required a high degree of substructure co-ordination and liaison with 3rd parties to obtain consent for construction.
A tightly controlled construction budget required an in-depth RIBA Stage 2 design and co-ordination package to be developed so that the Client had a high degree of cost certainty before submission for planning.
The Stage 3 work included an undercroft car park and by working closely with the architect and through detailed coordination, the need for a transfer slab was eliminated to maximise the efficiency of the scheme.
Conisbee were subsequently appointed for RIBA Stage 3 – 6 to undertake the detailed design of Blocks C & D (143 affordable units consisting of 7 -9 storeys) as a Design and Build contract with Lovell Partnerships acting as the Main Contractor. The Stage 4 design closely followed the principles set out and agreed during the pre-planning phase resulting in an early release of trade packages for procurement and allowing the construction to start on site with minimum impact to the programme.