Menu
hello index Queen Street, Colchester

This project, located within Colchester’s St Botolph’s Quarter regeneration area, is for the Demolition of a former bus garage and erection of new office/studio space and café/bar for the creative digital sector. The new building will provide 760m2 of lettable internal area over 4 storeys. The site is constrained by the part-Roman boundary wall to the south and is underlain by Roman archaeology.

Conisbee have been employed as contract administrator for the demolition of the former bus garage and structural and civil engineering services for the construction design of the new building. Our involvement has required liaison with the Colchester Borough Council’s archaeology team to safeguard the historic fabric during demolition, and also to design the substructure to cause minimal disturbance. The depths of foundations and attenuation tanks were limited to avoid clashing with the remnants of roman floor beneath the site.

The new building is a steel-framed structure with timber posi-joisted floors. This option has been chosen to control structural embodied carbon and cost and to provide flexibility for building service routing.

hello index Colchester Northern Gateway, Colchester

Conisbee was appointed by Turnstone Estates and HG Construction to provide Civil and Structural Engineering design and construction support for a new 200,000 sq. ft leisure complex at Colchester Northern Gateway.

The scheme includes a 12-screen multiplex cinema, 12 restaurants, 3 active leisure units, an 80-bed hotel, and a Fastned electric vehicle charging station, all formed around a high-quality landscaped piazza.

The leisure scheme forms a key part of wider development proposals to transform the Northern Gateway into a hub for improved health, jobs, housing and renewable energy.

Approximately 750 car parking spaces are provided across the scheme, alongside improved accessibility for pedestrian, cycles and public transport.  Car parking is provided in a combination of surface level car parking and an 80,000 sq. ft decked multi-storey car park.  In addition to Civil and Structural Engineering design services Conisbee undertook a review of the car parking proposals against the IStructE Design Recommendations for multi-storey car parks.

The civil and structural engineering design for the scheme involved some complex challenges, including the diversion of an existing watercourse that crosses the site, variable ground conditions including made ground, and significant earthworks volumes.

Soil stabilisation was utilised beneath the access roads and car parking areas in order to improve the subgrade and reduce the required pavement construction depth.  This solution offered the further benefit of reducing the volume of earthwork removal from the site.

The sitewide design provided complex, necessitating close coordination with the design team and Client to ensure that the requirements of the end user were accommodated.

The scheme reached practical completion for the shell and core in May 2024, with phased opening of the leisure uses following fit out.

 

hello index Moskva Plaza, Kharkov, Ukraine

These development proposals comprise a 20-storey office and retail block and two 18-storey residential towers with three levels of underground parking and retail.

The retail proposals include entertainment facilities, restaurants/bars, shops and a conference centre. We provided structural services up to concept design stage for this proposed mixed-use scheme in Kharkov.

hello index Gorkogo Project, Kiev

Conisbee provided a structural engineering detailed design for this proposed large-scale, mixed-use development in downtown Kiev for a local private developer with American architect Laguarda Low.

The proposals include 100,000 sq m of office space and 250,000 sq m of Grade A residential up to 32 storeys with 100,000 sq m of retail and 150,000 sq m of car-parking in a six-storey basement.

 

hello index Luton Napier Gateway, Luton hello index St. Botolph’s Quarter, Colchester

Alumno have planning permission to regenerate the site of the old Queen Street bus station in Colchester adjacent to the historic city wall.

The proposals include student accommodation, a new hotel, commercial space and public realm.

The site overlays extensive archaeological remains including a series of Roman floors. This limits the extent of foundations and so the buildings will be supported by a combination of new piling and repurposed existing foundations from a demolished office building.

Both modular and reinforced concrete solutions are being developed as structural solutions for each building.

The sustainable drainage solutions are constrained by the allowable depth of excavation, which is also limited by the Roman archaeology.

The southern site boundary is formed by the historic, part-Roman, city wall. The current proposal includes structural modifications to this wall, which require Historic England consent.

hello index Somerleyton Road, Brixton

The site comprises a long strip of land between Somerleyton Road and the railway embankment development and comprises six separate development blocks.

There are five new buildings along with a refurbished masonry block to incorporate 304 new homes, a community theatre, a community centre and nursery, creative / cultural office space, educational space, a chef’s school and public realm redevelopment including a street gym.

Conisbee were appointed for Civil and Structural Engineering Design services for the entire development including the renovation of the locally listed Carlton Mansions. We have developed the structural designs for all six buildings as well as the below ground foul and surface water site-wide below ground drainage.

The project has some challenging site constraints, including LUL Victoria line tunnels running below the footprint of the site. We liaised directly with LUL to obtain record information and organise additional survey information to determine the make-up, location and condition of the existing tunnels so that this information could be incorporated into our design for the buildings positioned over the tunnels. Developing different foundation solutions for the development at feasibility stage was key in determining the most viable approach for the overall massing of the scheme by ensuring that predicted movements of the below ground tunnels remained within tolerable limits.

Additionally, there is an existing Network Rail embankment adjacent to the boundary of the site over the full 450m length of the site. In many locations our proposed new foundations encroach on the support zone for the embankment so we have liaised with Network Rail to develop solutions and construction sequences which will not undermine the stability of the embankment and the railway lines above.

Each block has a structural system appropriate for the building type and layout, with rc frame being mainly used on the residential blocks and steel frame for the theatre. Alterations to the retained building were carried out in masonry and steel, with structural repairs and strengthening also required to the dilapidated structure. The existing foundations for the building were re-used to minimise embodied carbon on the scheme.

With respect to the civil engineering aspect of the project the drainage design has incorporated sustainable drainage systems to reduce surface water run-off from the site and provide treatment of surface water before discharge to the ground and the public sewer system. These systems include green roofs, permeable paving and surface water infiltration beds.

Innovation was required in the foundation solutions which were developed for the building structures located over the underground tunnels. A variety of methods have been adopted including 15m span reinforced concrete foundation beams supported by 1050mm diameter bored piles either side of the tunnel exclusion zones, ground bearing raft foundations where piling and bridging solutions were not feasible due to the positioning of the below ground tunnels and underpinning of existing foundations to allow for increased loading due to change in use from residential to office space. While the above techniques in themselves are not new methods of construction, incorporating and coordinating the various solutions into the overall design has resulted in quite bespoke and innovative sub-structure design.

hello index Caledonian Road, London

This project was for a sustainable mixed-use development comprised of 25 residential units, 2 commercial units and a retail unit.

The project involved the refurbishment the Victorian frontage building to Caledonian Road, creating a ground floor retail space with 2 residential units above.

Behind the property, the existing stables were converted into office space. The new-build section of the development is set behind the frontage which will provide a further 21 contemporary residential units and a pair of semi-detached houses. To the rear of the site further office space was provided.

One of the major challenges of the project was the proximity of Network Rail land and the other  being building over the High Speed 1 tunnel  immediately below the site. A reinforced concrete raft foundation was employed and this produced an efficient and buildable engineering design. This dealt effectively with the site constraints and ensured that design approval from Network Rail and High Speed 1 was successfully achieved.