hello index Sawston Unity Campus, Phase 2

Sawston Unity Campus Phase 2 marks the continuation of development at Sawston Trade Park, introducing three new office and life sciences buildings alongside an extension to the existing multi-storey car park.

Our involvement in this project spanned RIBA Stages 2 to 6, focusing on the construction of facilities tailored for life sciences and healthcare purposes. The total construction value is estimated at £15 million, with the new buildings covering a gross internal area (GIA) of 5630 square meters and the multi-storey car park adding 4500 square meters.

Key facilities include offices, laboratories, healthcare facilities, and ample car parking space. The structural concept used was reinforced concrete frames with precast vertical elements.

Design solutions were implemented to address site constraints, including ground contamination. Sustainability was a priority throughout the project, with carbon calculations and options comparisons conducted from RIBA Stage 2 onwards. The SCORS Carbon Calculator indicates a Grade C rating, with emissions estimated at 232 kg/m2. A Design and Build procurement route was followed.

hello index Thorlabs Ltd Headquarters hello index Sawston Unity Campus, Unit H

The refurbishment of the existing Unit H involved the radical transformation of a disused agricultural warehouse into a modern, state of the art office building, with facilities split over two levels.

It was an architecturally led project which utilised and exposed the existing precast concrete portal frames and involved the construction of a new steel framed first floor and central lift and stair core, to produce a vibrant and dynamic work environment, appealing to a wide range of end users.  The materials used in the construction were minimised as far as possible through the re-use of the existing structure and the efficient design of the new steel structure. Composite cell beams were used to support the new first floor structure, in order to provide flexibility to install, and adapt if required, service runs where floor to ceiling space was limited.

Initially Conisbee were appointed to undertake design works to Unit H, RIBA Stage 0-6, now known as The Works. Unit H was a warehouse building located in Sawston Trade Park which has been redeveloped as part of a comprehensive redevelopment of Sawston Trade Park to form the Unity Campus. The existing building was a two-storey warehouse with a shallow pitched roof, concrete structure, and profiled metal cladding. While the majority of the internal space is double storey, the western part of the building has previously been used as a two-storey office space.

The works building and associated infrastructure, including a multi storey car park form Phase 1 of a much larger masterplan for development at the Unity Campus. Conisbee are currently undertaking structural and civil engineering design works for Phase 2 of the project which is anticipated to include the construction of three new buildings consisting of an office and laboratory mix, along with associated infrastructure, including an extended multi storey car park.

The infrastructure works include the engineering design of the new pavements and internal access roads at the site, along with the design of site wide below ground drainage. Phase 1 of the project included the realignment of an existing watercourse at the site to unlock development space at the site. Two surface water swales have also been constructed at the site within Phase 1 of the project. The development of the SuDS design and construction within Phase 1 and associated spur connections, allows flexibility within the development masterplan without the need for additional surface water attenuation, and if required, allows for a services plot strategy to be developed. The re-use and repurposing of the existing concrete frame reflected in a large reduction of the embodied carbon within the final scheme.

hello index Neal’s Yard Remedies Factory & Visitor Centre

This project which comprises a new factory, offices and visitor centre set in the company’s herb gardens in Dorset, was designed to meet the client’s aspirations for a highly sustainable construction.

Wherever possible minimal steel and concrete elements were utilised above ground and the use of engineered timber was maximised.

The new Neal’s Yard headquarters building is set within a landscape of herb and flower cultivation on a 5 hectare greenfield site, located on the fringes Gillingham in Dorset. The key design aims were to create a humane working environment with a social heart, to provide visible evidence of the Neal’s Yard Remedies environmental agenda and to demonstrate a prototype timber industrial building appropriate to its rural setting. We provided full architectural services up to tender; the project team was then novated to a Design and Build contractor.

CO2 emissions were reduced through high levels of insulation, natural ventilation and controlled daylight. Conservation of natural resources was also a priority, including investigations of on-site energy generation, water conservation, the collection of rainwater and the use of low embodied energy materials. The project was a successful test bed for the use of unfired clay bricks to add internal thermal mass; the building has a leakage rate of less than one fifth of the statutory requirements.

hello index Gasholders, London hello index Nine Elms Sewer Diversion, London hello index Museum of Science & Industry, Manchester