Featherstone Young and Conisbee were appointed by local charity Providence Row to design a new build as part of their day centre facility.

Providence Row provides support and hope to homeless people in Tower Hamlets and the City of London, and the Dellow Day Centre provides essential services such as food, clothing and showers – which help to restore health and dignity to those in difficult circumstances.

The new building is constructed on a tight infill site and replaces an existing outpost building with a new extension block with an increased footprint containing a laundry, clothes store, archive, storage, activity space and art room facilities.

The new structure was originally conceived as a lightweight braced steel frame with piled raft foundations. Due to the long and complex history and previous buildings on the site, the site investigation threw up a number of challenges including the discovery of the foundations of a 20m high chimney from a previous brickworks on the site. As a result of finding a multitude of obstructions in the ground during the SI, the design was changed to deep strip foundations which could accommodate any unexpected obstructions easier than the original piled solution. Conisbee worked closely with the main contractor to ensure that these were installed safely due to the depth of excavation required to get through the made ground and into the load-bearing gravels.

The steel frame was chosen as the best material to meet the tight programme on site as well as satisfying the architectural aspirations for the superstructure to be a light and flexible space with large rooflights and glazing elements. The floors are lightweight timber I joists with a ply deck which keeps the overall weight of the building to a minimum while providing a stiff diaphragm and floor for the office and general purpose spaces in the building.