hello index Gorkogo Project, Kiev

Conisbee provided a structural engineering detailed design for this proposed large-scale, mixed-use development in downtown Kiev for a local private developer with American architect Laguarda Low.

The proposals include 100,000 sq m of office space and 250,000 sq m of Grade A residential up to 32 storeys with 100,000 sq m of retail and 150,000 sq m of car-parking in a six-storey basement.

 

hello index Sawston Unity Campus, Unit H

The refurbishment of the existing Unit H involved the radical transformation of a disused agricultural warehouse into a modern, state of the art office building, with facilities split over two levels.

It was an architecturally led project which utilised and exposed the existing precast concrete portal frames and involved the construction of a new steel framed first floor and central lift and stair core, to produce a vibrant and dynamic work environment, appealing to a wide range of end users.  The materials used in the construction were minimised as far as possible through the re-use of the existing structure and the efficient design of the new steel structure. Composite cell beams were used to support the new first floor structure, in order to provide flexibility to install, and adapt if required, service runs where floor to ceiling space was limited.

Initially Conisbee were appointed to undertake design works to Unit H, RIBA Stage 0-6, now known as The Works. Unit H was a warehouse building located in Sawston Trade Park which has been redeveloped as part of a comprehensive redevelopment of Sawston Trade Park to form the Unity Campus. The existing building was a two-storey warehouse with a shallow pitched roof, concrete structure, and profiled metal cladding. While the majority of the internal space is double storey, the western part of the building has previously been used as a two-storey office space.

The works building and associated infrastructure, including a multi storey car park form Phase 1 of a much larger masterplan for development at the Unity Campus. Conisbee are currently undertaking structural and civil engineering design works for Phase 2 of the project which is anticipated to include the construction of three new buildings consisting of an office and laboratory mix, along with associated infrastructure, including an extended multi storey car park.

The infrastructure works include the engineering design of the new pavements and internal access roads at the site, along with the design of site wide below ground drainage. Phase 1 of the project included the realignment of an existing watercourse at the site to unlock development space at the site. Two surface water swales have also been constructed at the site within Phase 1 of the project. The development of the SuDS design and construction within Phase 1 and associated spur connections, allows flexibility within the development masterplan without the need for additional surface water attenuation, and if required, allows for a services plot strategy to be developed. The re-use and repurposing of the existing concrete frame reflected in a large reduction of the embodied carbon within the final scheme.

hello index Neal’s Yard Remedies Factory & Visitor Centre

This project which comprises a new factory, offices and visitor centre set in the company’s herb gardens in Dorset, was designed to meet the client’s aspirations for a highly sustainable construction.

Wherever possible minimal steel and concrete elements were utilised above ground and the use of engineered timber was maximised.

The new Neal’s Yard headquarters building is set within a landscape of herb and flower cultivation on a 5 hectare greenfield site, located on the fringes Gillingham in Dorset. The key design aims were to create a humane working environment with a social heart, to provide visible evidence of the Neal’s Yard Remedies environmental agenda and to demonstrate a prototype timber industrial building appropriate to its rural setting. We provided full architectural services up to tender; the project team was then novated to a Design and Build contractor.

CO2 emissions were reduced through high levels of insulation, natural ventilation and controlled daylight. Conservation of natural resources was also a priority, including investigations of on-site energy generation, water conservation, the collection of rainwater and the use of low embodied energy materials. The project was a successful test bed for the use of unfired clay bricks to add internal thermal mass; the building has a leakage rate of less than one fifth of the statutory requirements.

hello index Wieden + Kennedy Headquarters, London

A former brewery was  converted to create new offices for leading international communications agency Wieden + Kennedy.

Making the most of the height in the industrial shell, the spaces were designed to be fun and flexible, and included a series of mezzanine areas and ‘crows’ nests’ for creative contemplation. The mezzanine areas allowed for visual connections though the space and doubled the net floor area. Other spaces included a large kitchen/dining room, an auditorium and editing suites.

The main structural challenge was to back analyse the former existing structure and justify it for supporting and hanging additional mezzanine floors at two levels. The mezzanines also had to be as thin as possible with a maximum 120mm structural zone allowed. This was achieved using fabricated steel beams with lightweight timber floors.

The spans of the mezzanines were kept to a minimum by using discrete hangers from the floors above where possible as well as fixing back to the existing central column and external concrete walls.

hello index St. Botolph’s Quarter, Colchester

Alumno have planning permission to regenerate the site of the old Queen Street bus station in Colchester adjacent to the historic city wall.

The proposals include student accommodation, a new hotel, commercial space and public realm.

The site overlays extensive archaeological remains including a series of Roman floors. This limits the extent of foundations and so the buildings will be supported by a combination of new piling and repurposed existing foundations from a demolished office building.

Both modular and reinforced concrete solutions are being developed as structural solutions for each building.

The sustainable drainage solutions are constrained by the allowable depth of excavation, which is also limited by the Roman archaeology.

The southern site boundary is formed by the historic, part-Roman, city wall. The current proposal includes structural modifications to this wall, which require Historic England consent.

hello index Somerleyton Road, Brixton

The site comprises a long strip of land between Somerleyton Road and the railway embankment development and comprises six separate development blocks.

There are five new buildings along with a refurbished masonry block to incorporate 304 new homes, a community theatre, a community centre and nursery, creative / cultural office space, educational space, a chef’s school and public realm redevelopment including a street gym.

Conisbee were appointed for Civil and Structural Engineering Design services for the entire development including the renovation of the locally listed Carlton Mansions. We have developed the structural designs for all six buildings as well as the below ground foul and surface water site-wide below ground drainage.

The project has some challenging site constraints, including LUL Victoria line tunnels running below the footprint of the site. We liaised directly with LUL to obtain record information and organise additional survey information to determine the make-up, location and condition of the existing tunnels so that this information could be incorporated into our design for the buildings positioned over the tunnels. Developing different foundation solutions for the development at feasibility stage was key in determining the most viable approach for the overall massing of the scheme by ensuring that predicted movements of the below ground tunnels remained within tolerable limits.

Additionally, there is an existing Network Rail embankment adjacent to the boundary of the site over the full 450m length of the site. In many locations our proposed new foundations encroach on the support zone for the embankment so we have liaised with Network Rail to develop solutions and construction sequences which will not undermine the stability of the embankment and the railway lines above.

Each block has a structural system appropriate for the building type and layout, with rc frame being mainly used on the residential blocks and steel frame for the theatre. Alterations to the retained building were carried out in masonry and steel, with structural repairs and strengthening also required to the dilapidated structure. The existing foundations for the building were re-used to minimise embodied carbon on the scheme.

With respect to the civil engineering aspect of the project the drainage design has incorporated sustainable drainage systems to reduce surface water run-off from the site and provide treatment of surface water before discharge to the ground and the public sewer system. These systems include green roofs, permeable paving and surface water infiltration beds.

Innovation was required in the foundation solutions which were developed for the building structures located over the underground tunnels. A variety of methods have been adopted including 15m span reinforced concrete foundation beams supported by 1050mm diameter bored piles either side of the tunnel exclusion zones, ground bearing raft foundations where piling and bridging solutions were not feasible due to the positioning of the below ground tunnels and underpinning of existing foundations to allow for increased loading due to change in use from residential to office space. While the above techniques in themselves are not new methods of construction, incorporating and coordinating the various solutions into the overall design has resulted in quite bespoke and innovative sub-structure design.

hello index Soap Box, Old Street, London

Soap Box is typical example of a mid 20th century mid-rise development. The existing building comprises four storeys plus a basement, all of reinforced concrete construction. The works involved the refurbishment of ground and basement levels only, with the above three storeys of office space remaining in operation throughout the entire works.

The concrete frame is typical of a commercial property, comprising one way spanning slabs on downstand beams. The scope of our works principally involved alterations to the structure to accommodate new stairs and lifts, strengthening of the pot and beam floors to accommodate dance studios, and amendments to the envelope to create a more modern and exciting look to the building.

The project presented a number of challenges: strengthening the floor above a live substation; achieving the minimum headroom at basement level given the new steelwork and mass of new services; connecting the new drainage infrastructure; and generally having to prove an existing structure that had undergone alterations in the past. Consideration also had to be given to minimising noise disturbance to the above live offices.

 

Photography @Charles Hosea

 

hello index Brunner UK Showroom, London

Conisbee worked closely with McDowell+Benedetti to create a new London HQ and public showroom for our client and international furniture company, Brunner. The new space occupies a large 3-storey Victorian warehouse space on Rosebery Avenue, near Exmouth Market in Clerkenwell.

The architect’s response to Brunner’s brief was to strip back the building’s interior to reveal original key features of the building’s industrial heritage, including its steel beams and sandblasted brickwork.

The main structural intervention involved forming new openings in the ground and 1st floors, to accommodate a linear, floating steel staircase which connected the basement, ground and first floors. The stair was fabricated from 20mm steel plate with the treads and risers designed to cantilever from a 20mm steel balustrade spanning between the landing support points. Careful finite element analysis and detailing was required to ensure that the stair supports were discrete and that deflection vibration was kept to acceptable standards for public use.

 

hello index Caledonian Road, London

This project was for a sustainable mixed-use development comprised of 25 residential units, 2 commercial units and a retail unit.

The project involved the refurbishment the Victorian frontage building to Caledonian Road, creating a ground floor retail space with 2 residential units above.

Behind the property, the existing stables were converted into office space. The new-build section of the development is set behind the frontage which will provide a further 21 contemporary residential units and a pair of semi-detached houses. To the rear of the site further office space was provided.

One of the major challenges of the project was the proximity of Network Rail land and the other  being building over the High Speed 1 tunnel  immediately below the site. A reinforced concrete raft foundation was employed and this produced an efficient and buildable engineering design. This dealt effectively with the site constraints and ensured that design approval from Network Rail and High Speed 1 was successfully achieved.