Menu
hello index Mill House, Cambridge

This development, delivered by CamProp with MCW Architects and Conisbee, replaced an existing building and enhanced the street frontage and public realm around Newnham Mill.

With ground floor commercial spaces and upper floor apartments offering great views, the project is energy-efficient, well-designed, and positively impacts the character and distinctiveness of the local area.

In consideration of the site’s sensitivity and public interest in its redevelopment, initiated consultation sessions were held with local community groups. The sessions included representatives from the South Newnham Residents Forum and Newnham Croft Residents Association to discuss design work.

The site is within flood zone 2 & 3, necessitating careful consideration from concept design to detailed construction. Conisbee provided the preplanning service including the flood risk assessment, compensation strategy, evacuation strategy and sequential flood testing.  Close collaboration with the design team was required to provide understanding of flood-resistant measures that were integral to the design.

Placing all residential units on the first floor and out of the flood risk zone was critical. Additional measures for ground floor areas included in situ concrete up to the first floor and high-level routing of power and data feeds. Temporary flood barriers can be inserted into external door frames.

 

Photography @Philip Vile

 

hello index Sawston Unity Campus, Phase 2

Sawston Unity Campus Phase 2 marks the continuation of development at Sawston Trade Park, introducing three new office and life sciences buildings alongside an extension to the existing multi-storey car park.

Our involvement in this project spanned RIBA Stages 2 to 6, focusing on the construction of facilities tailored for life sciences and healthcare purposes. The total construction value is estimated at £15 million, with the new buildings covering a gross internal area (GIA) of 5630 square meters and the multi-storey car park adding 4500 square meters.

Key facilities include offices, laboratories, healthcare facilities, and ample car parking space. The structural concept used was reinforced concrete frames with precast vertical elements.

Design solutions were implemented to address site constraints, including ground contamination. Sustainability was a priority throughout the project, with carbon calculations and options comparisons conducted from RIBA Stage 2 onwards. The SCORS Carbon Calculator indicates a Grade C rating, with emissions estimated at 232 kg/m2. A Design and Build procurement route was followed.

hello index Voss Street

Retrofit of an old lock-up garage on an historic East London cobbled mews creating a FY Studio a light-filled, compact and flexible multifunctional work space.

By reusing a longstanding, familiar building, we retain the character of the mews bringing social benefits as well as being environmentally sustainable. All materials were chosen to maximise reuse and minimise waste.

The plots on Voss Street are narrow with deep windowless footprints. FY Studio’s footprint measures only 3.8 x 7.8m. The existing single storey building was in poor condition with a leaking roof but benefitted from considerable height below the roof capable of accommodating a first floor.

The open plan spaces are linked by a double height space over the entrance and stairs, angled to create generosity and delight. Spaces are kept undefined so there is flex as to how the studio is used, this is helped by an internal glazed screen wall and sliding mirrored doors.

hello index Queen Street, Colchester

This project, located within Colchester’s St Botolph’s Quarter regeneration area, is for the Demolition of a former bus garage and erection of new office/studio space and café/bar for the creative digital sector. The new building will provide 760m2 of lettable internal area over 4 storeys. The site is constrained by the part-Roman boundary wall to the south and is underlain by Roman archaeology.

Conisbee have been employed as contract administrator for the demolition of the former bus garage and structural and civil engineering services for the construction design of the new building. Our involvement has required liaison with the Colchester Borough Council’s archaeology team to safeguard the historic fabric during demolition, and also to design the substructure to cause minimal disturbance. The depths of foundations and attenuation tanks were limited to avoid clashing with the remnants of roman floor beneath the site.

The new building is a steel-framed structure with timber posi-joisted floors. This option has been chosen to control structural embodied carbon and cost and to provide flexibility for building service routing.

hello index Wallis Road, London

Working in close collaboration with HTA Design Conisbee provided structural engineering advice to reimagine and repurpose a series of interconnected Victorian warehouses to create a permanent new home for their new office situated in Hackney Wick in east London accommodating 200 staff members.

Built during the mid-19th century as a factory to manufacture the world’s first synthetic plastic – Parkesine – and identified as a significant heritage asset in the Hackney Wick masterplan the site comprises a range of buildings constructed sequentially in manner and style highly representative of the industrial heritage of the area. Industrial operations at the site effectively ceased in the 1960s and the later use of the buildings for car repairs, storage and other light industrial purposes generated a number of structural defects and contamination concerns to contend with.

Beginning with a detailed investigation and structural assessment of the buildings, involving a comprehensive visual inspection of all accessible areas from ground level and also at high level via Mobile Elevated Working Platform (MEWP), we identified and assessed all defects – including decayed timber roof trusses, corroded steel beams, distorted brickwork walls and ill-considered historic structural alterations – and recommended corresponding remedial interventions to facilitate conversion of the buildings to offices in accordance with HTA Design’s brief while taking into account the wider development proposals around the site.

In addition we advised on enlargement of the existing mezzanine floor, installation of new staircases, a new lift and new rooflights to reflect the client’s aspirations for the different spaces and their uses, helping to link the four separate buildings into one seamless, accessible, flexible and interconnected workspace.

hello index Colchester Northern Gateway, Colchester

Conisbee was appointed by Turnstone Estates and HG Construction to provide Civil and Structural Engineering design and construction support for a new 200,000 sq. ft leisure complex at Colchester Northern Gateway.

The scheme includes a 12-screen multiplex cinema, 12 restaurants, 3 active leisure units, an 80-bed hotel, and a Fastned electric vehicle charging station, all formed around a high-quality landscaped piazza.

The leisure scheme forms a key part of wider development proposals to transform the Northern Gateway into a hub for improved health, jobs, housing and renewable energy.

Approximately 750 car parking spaces are provided across the scheme, alongside improved accessibility for pedestrian, cycles and public transport.  Car parking is provided in a combination of surface level car parking and an 80,000 sq. ft decked multi-storey car park.  In addition to Civil and Structural Engineering design services Conisbee undertook a review of the car parking proposals against the IStructE Design Recommendations for multi-storey car parks.

The civil and structural engineering design for the scheme involved some complex challenges, including the diversion of an existing watercourse that crosses the site, variable ground conditions including made ground, and significant earthworks volumes.

Soil stabilisation was utilised beneath the access roads and car parking areas in order to improve the subgrade and reduce the required pavement construction depth.  This solution offered the further benefit of reducing the volume of earthwork removal from the site.

The sitewide design provided complex, necessitating close coordination with the design team and Client to ensure that the requirements of the end user were accommodated.

The scheme reached practical completion for the shell and core in May 2024, with phased opening of the leisure uses following fit out.

 

hello index 4 – 8 Victoria Street London hello index Danesgate, Stevenage

Conisbee were appointed by Lovell Partnership to assist with the development, which comprises a mix of 526 residential units for shared ownership and social rent, with part of the ground floor allocated to commercial use and private parking.

The site is divided into six independent blocks, with the landmark apartment tower—a 21-storey reinforced concrete frame—situated on the north-west corner. Courtyards between the blocks provide communal outdoor areas for residents and have also been designed to incorporate the site’s SuDS strategy.

The development is constrained by a high-pressure gas main bisecting the site which required a high degree of substructure co-ordination and liaison with 3rd parties to obtain consent for construction.

A tightly controlled construction budget required an in-depth RIBA Stage 2 design and co-ordination package to be developed so that the Client had a high degree of cost certainty before submission for planning.

The Stage 3 work included an undercroft car park and by working closely with the architect and through detailed coordination, the need for a transfer slab was eliminated to maximise the efficiency of the scheme.

Conisbee were subsequently appointed for RIBA Stage 3 – 6 to undertake the detailed design of Blocks C & D (143 affordable units consisting of 7 -9 storeys) as a Design and Build contract with Lovell Partnerships acting as the Main Contractor.   The Stage 4 design closely followed the principles set out and agreed during the pre-planning phase resulting in an early release of trade packages for procurement and allowing the construction to start on site with minimum impact to the programme.

 

Photography @Guiness Partnership

hello index Lukhyanovka Shopping Centre, Kiev

The proposals are for a 130,000m2 mixed-use shopping centre in downtown Kiev, Ukraine. In addition to the retail floors the development will include a 10 storey residential block, leisure facilities and two basement levels of car parking.

The site was originally a tram depot and the project includes the retention and conversion of a historic diesel generator building into a restaurant and another existing building locally known as the Lenin building will also be retained. The diesel generator building will be the focal point for the whole development and is significant because it is very unusual for existing buildings to be retained on new developments in the Ukraine.

Conisbee are offering full design service through to construction in conjunction with a local partner.

hello index Moskva Plaza, Kharkov, Ukraine

These development proposals comprise a 20-storey office and retail block and two 18-storey residential towers with three levels of underground parking and retail.

The retail proposals include entertainment facilities, restaurants/bars, shops and a conference centre. We provided structural services up to concept design stage for this proposed mixed-use scheme in Kharkov.