Menu

Colchester Northern Gateway, Colchester

Conisbee was appointed by Turnstone Estates and HG Construction to provide Civil and Structural Engineering design and construction support for a new 200,000 sq ft leisure complex at Colchester Northern Gateway.

The scheme includes a 12-screen multiplex cinema, 12 restaurants, three active leisure units, an 80-bed hotel, and a Fastned electric vehicle charging station, all formed around a high-quality landscaped piazza.

The leisure scheme forms a key part of wider development proposals to transform the Northern Gateway into a hub for improved health, jobs, housing and renewable energy.

Approximately 750 car parking spaces are provided across the scheme, alongside improved accessibility for pedestrians, cyclists and public transport.  Car parking is provided in a combination of surface-level car parking and an 80,000 sq ft decked multi-storey car park.  In addition to Civil and Structural Engineering design services, Conisbee undertook a review of the car parking proposals against the IStructE Design Recommendations for multi-storey car parks.

The civil and structural engineering design for the scheme involved several complex challenges, including the diversion of an existing watercourse that crosses the site, variable ground conditions including made ground, and significant earthworks volumes.

Soil stabilisation was utilised beneath the access roads and car parking areas to improve the subgrade and reduce the required pavement construction depth.  This solution offered the further benefit of reducing the volume of earthwork removal from the site.

The sitewide design presented complexity, necessitating close coordination with the design team and client to ensure that the requirements of the end user were accommodated.

The scheme reached practical completion for the shell and core in May 2024, with phased opening of the leisure uses following fit-out.

Client:

H G Construction

Architect:

CMP Architects

Project Value:

£47million