Menu

The Palace of Westminster, London

Conisbee, in conjunction with our consortium partners Sandberg, Hirst Conservation, Hutton+ Rostron, were appointed to a four-year framework to undertake intrusive surveys at the Palace of Westminster.

Our involvement will be to undertake extensive non-destructive and intrusive surveys into the structure and material properties of the building fabric, to assist with the largest heritage restoration project ever undertaken in the UK.

The consortium will be known as the Palace Restoration Consultancy. Each of the consortium members has considerable expertise in historic buildings, municipal buildings, arts venues, and many other listed and scheduled monuments. We very much look forward to working with the Restoration & Renewal and wider project teams on this iconic building.

There has been significant under-investment in the fabric of the Palace since its completion in the 1860s. The building has never undergone a major renovation, and the heating, ventilation, water, drainage and electrical systems are extremely antiquated. Therefore, the Restoration and Renewal Programme has been established to address the significant work required to protect the heritage of the Palace of Westminster and ensure it continues to serve as home to the UK Parliament.  Survey works are required during the pre-construction phase of the Programme to provide the designers with key information they need to design buildings, their modifications, building services, infrastructure, conservation measures and the masterplan with an effective, healthy and safe outcome.

Palace Restoration Consortium have been appointed to undertake the on-site surveys at the Palace to investigate the existing building, where requested, as part of this restoration process. The works comprise localised targeted intrusive and non-intrusive investigations to expose and understand the condition, geometric and material properties of select walls, floors and ceilings within the Palace of Westminster. Non-destructive scanning techniques will be predominantly used in combination with detailed visual inspections, and where required, intrusive techniques including sampling, coring and other investigation works are proposed.

Client:

Palace of Westminster

Architect:

N/A

Project Value:

Confidential